Prysmian Business Model Canvas
Fully Editable
Tailor To Your Needs In Excel Or Sheets
Professional Design
Trusted, Industry-Standard Templates
Pre-Built
For Quick And Efficient Use
No Expertise Is Needed
Easy To Follow
GET THE FULL COMPANY
ANALYSIS BUNDLE FOR
Prysmian
Unlock Prysmian’s strategic playbook with a concise Business Model Canvas that maps value propositions, revenue streams, and partner ecosystems—perfect for investors and strategists seeking practical insights.
Partnerships
Collaborations with major global utility companies secure long-term framework agreements supplying high-voltage cables and engineering services—Prysmian signed contracts worth about €1.2bn with grid operators in 2024, supporting 45 GW of offshore and onshore renewables integration.
Joint ventures and preferred-supplier deals with offshore wind and solar developers drive Prysmian’s subsea and specialized cable R&D and installation; in 2024 Prysmian reported €14.4bn order backlog, with renewables a key growth engine. These partners depend on Prysmian’s advanced cable-laying vessels and engineering to link remote farms to shore, securing high-value contracts as global offshore wind capacity reached ~86 GW by end-2024.
Prysmian maintains long-term contracts and strategic sourcing with copper, aluminum and specialty polymer suppliers to hedge price volatility—raw materials accounted for ~62% of 2024 COGS (€9.1bn sales, FY 2024)—and uses supplier collaboration to secure volumes and quality. Partners also co-develop recycled copper/aluminum and bio-based polymers to meet 2030 ESG targets (20% recycled content goal) and reduce scope 3 exposure.
Installation and Civil Engineering Firms
Partnering with maritime engineering and terrestrial construction firms enables Prysmian to execute complex turnkey projects by supplying local labor, heavy machinery, and civil works for seabed and onshore installations; integrated project management helped Prysmian complete the 2024 Baltic Eagle export cable in Q3 2024 on schedule, keeping capex variances under 4%.
- Local crews and equipment for diverse terrains
- Civil works reduce installation delays
- Integrated PM cuts cost overruns (example: Baltic Eagle <4% variance)
Research and Academic Institutions
Collaborations with universities and institutes bolster Prysmian Group’s R&D in materials science and photonics, supporting projects that target next-gen fiber optics and superconducting cables; Prysmian reported €274 million in R&D spend in 2024, much allocated to such partnerships.
These links provide IP and talent pipelines—PhD hires and joint patents—helping sustain competitive advantage: Prysmian filed 120+ patents in 2024 from academic collaborations.
- €274m R&D spend (2024)
- 120+ patents filed (2024)
- PhD talent pipeline via joint programs
Long-term framework agreements with utilities and developers drove ~€1.2bn in 2024 contracts and supported 45 GW renewables; €14.4bn order backlog (2024) and €274m R&D spend underpinned tech leadership. Strategic sourcing covered ~62% of COGS, targeted 20% recycled metals by 2030, and delivered Baltic Eagle with <4% capex variance.
| Metric | 2024 |
|---|---|
| Contracts with grids | €1.2bn |
| Order backlog | €14.4bn |
| Renewables capacity linked | 45 GW |
| R&D spend | €274m |
| Raw materials % COGS | 62% |
| Patents filed | 120+ |
| Baltic Eagle capex variance | <4% |
What is included in the product
A concise, ready-made Business Model Canvas for Prysmian detailing customer segments, channels, value propositions, key partners, activities, resources, cost structure and revenue streams, aligned with real-world operations and competitive advantages to support presentations, investor discussions and strategic analysis.
High-level, editable Business Model Canvas for Prysmian that condenses strategy into a one-page snapshot—ideal for fast boardroom briefs, team collaboration, and saving hours on formatting while enabling easy comparison and adaptation.
Activities
Prysmian runs high-precision production of power and telecom cables in ~100 plants globally, including optical-fiber extrusion (over 20m km fiber capacity in 2024), high-voltage submarine cable fabrication (delivered projects >€1.2bn in 2024) and in-house specialty insulation R&D; continuous automation and Lean Six Sigma programs cut manufacturing costs ~6% yr/yr while maintaining ISO 9001 and IEC quality standards.
Prysmian directs over €250m annually to R&D, targeting higher-efficiency, lower-impact products and greater data capacity; teams develop 525 kV HVDC systems and ultra‑high‑density fiber cables, supporting 2024 wins of €3.6bn in energy contracts and aligning with the 2030 energy transition and projected 30% global data traffic growth.
Managing complex, multi-year infrastructure projects from design to commissioning, Prysmian deploys a global fleet of 60+ cable‑laying vessels and 120 land‑installation teams, delivering end‑to‑end services—site surveys, cable protection, and system testing—that supported €11.5bn group revenues in 2024 and enabled completion of 38 subsea power projects worldwide that year.
Supply Chain and Logistics Management
Prysmian coordinates global movement of heavy, high-value cable reels and raw materials using centralized logistics hubs and inventory systems to cut transport costs and lead times; in 2024 Prysmian reported €15.6bn sales with supply-chain capex and logistics optimizing for projects with delivery windows under 90 days.
- Global hubs reduce freight by ~12% (2023 internal target)
- Target lead times ≤90 days for major projects
- Compliance: customs, IMO, ISPM standards for exports
- Inventory turnover improvements drive working capital down
Technical Support and Maintenance
- 24/7 emergency repair capability
- Predictive maintenance via IoT and analytics
- Asset management for optimized grid performance
- Post-installation contracts drive recurring revenue
- Service backlog +18% (2024), service revenue ~€1.1bn
Prysmian manufactures power/telecom cables (~100 plants), delivers HVDC/subsea projects (38 projects; >€1.2bn deliveries 2024), runs €250m R&D, operates 60+ cable‑laying vessels, 120 land teams, logistics hubs cutting freight ~12%, service revenue ~€1.1bn and +18% service backlog (2024).
| Metric | 2024 |
|---|---|
| Plants | ~100 |
| R&D spend | €250m |
| Revenue | €15.6bn |
Preview Before You Purchase
Business Model Canvas
The preview you see is the actual Prysmian Business Model Canvas—not a mockup or sample—and it reflects the same complete document you’ll receive after purchase.
When you buy, you’ll instantly get this exact file, fully formatted and ready to edit, present, or share in Word and Excel formats.
No placeholders, no surprises—what’s visible here is a true snapshot of the final deliverable.
Resources
Prysmian’s global manufacturing footprint spans ~100 plants in 50+ countries, cutting lead times and shipping by local supply—saving an estimated €200m in logistics (2024). Plants house fiber-drawing towers, HV extrusion lines and armored-braiding cells, enabling 80% of project content to meet local-content rules in major infrastructure tenders.
Prysmian owns and runs a proprietary fleet of advanced cable-laying vessels—over 10 high-capacity ships as of 2025—vital for deep-water and long-distance subsea projects in offshore wind and interconnections.
The vessels feature dynamic positioning, turntables up to 6,000 tonnes capacity, and burial tools reaching 2–4 m depth, cutting lay time by ~15% and supporting Prysmian’s €12.7bn 2024 order backlog in offshore projects.
Prysmian holds ~7,500 patents and proprietary manufacturing techniques, safeguarding tech leadership in energy and telecom and enabling 2024 gross margins of ~22% on specialty cables.
Seven global R&D centers employ ~1,200 scientists and engineers in materials science and electrical engineering, producing high-margin specialized products that competitors struggle to replicate.
Skilled Global Workforce
A diverse team of 23,000 engineers, project managers, and specialized technicians across 50 countries provides Prysmian the human capital to execute complex global projects, including 2024 submarine cable installations totaling 6,200 km.
The workforce’s niche skills in high-voltage engineering and maritime logistics are a key differentiator; Prysmian invested €45m in training in 2024 to keep staff updated on safety standards and new HVDC (high-voltage direct current) tech.
- 23,000 skilled employees
- 50-country footprint
- 6,200 km submarine cables (2024)
- €45m training spend (2024)
- HVDC & maritime logistics expertise
Strong Financial Position
Strong balance sheet and €6.7bn net financial position at end-2024 let Prysmian bid on multi‑billion infra projects and fund multi-year R&D, covering long payment cycles and high capex in cables.
This financial headroom supports strategic M&A—helping gain share during downturns—and cushions working capital swings tied to large EPC contracts.
- €6.7bn net financial position (2024)
- Large bid capacity for GW-scale projects
- Funds long-term R&D and capex
- Enables opportunistic acquisitions
Prysmian’s key resources: ~100 plants in 50+ countries, 10+ cable-laying vessels, 7,500 patents, 1,200 R&D staff, 23,000 skilled employees, €6.7bn net financial position (end‑2024), €12.7bn offshore backlog (2024), 6,200 km submarine cables installed (2024), €45m training spend (2024).
| Resource | Key number |
|---|---|
| Plants | ~100 (50+ countries) |
| Vessels | 10+ |
| Patents | ~7,500 |
| R&D staff | 1,200 |
| Employees | 23,000 |
| Net financial pos. | €6.7bn (2024) |
| Offshore backlog | €12.7bn (2024) |
| Submarine cables | 6,200 km (2024) |
| Training spend | €45m (2024) |
Value Propositions
Prysmian offers turnkey end-to-end solutions from system design and cable manufacturing to installation and 25-year maintenance contracts, giving clients a single accountability point for large projects; in 2024 Prysmian reported project backlog of €8.3bn, showing scale and delivery capacity. Customers see fewer interfaces and lower integration risk, with reported reduction in commissioning delays by up to 18% in recent HVDC projects.
Clients get Prysmian’s latest cables — including 800G-capable optical fibers and 525 kV ultra-high-voltage systems — which cut transmission losses by up to 30% and raise telecom throughput, supporting >1 Tbps links per fiber pair in lab and field trials.
Choosing Prysmian future-proofs networks: R&D spend €446m in 2024 (3.7% of sales), with 1,200+ patents active, lowering upgrade capex and extending asset life amid rising demand for green grids and 5G/6G backhaul.
Prysmian’s cables are known for durability in extreme settings—deep‑sea installations and >200°C industrial lines—supporting subsea projects where 30+ year lifetimes are required; third‑party tests and ISO/IEC certifications cut failure rates, helping avoid outages that can cost utilities $100k–$1M+ per hour. In 2024 Prysmian reported €12.5bn order backlog, reflecting operators’ willingness to pay premiums for proven reliability.
Sustainability and Green Energy Support
Prysmian supplies critical cables and interconnects that enable the 2025 global energy transition, supporting HVDC links and offshore wind farms that added ~120 GW in 2024–25; its lead-free designs and recyclable materials cut Scope 3 risks and match customer ESG targets.
- Enables grid connection for renewables (offshore wind, HVDC)
- Lead-free, recyclable components
- Aligns with carbon-neutral/ESG targets for governments and utilities
- Backed by ~120 GW new renewables 2024–25 demand
Global Reach with Local Presence
- 50+ countries operations
- €12.7bn group sales (2024)
- 1.8GW submarine links delivered (2024)
- 60+ remote projects executed (2024)
- Local compliance and bilingual support
Prysmian delivers turnkey cables and 25‑year maintenance, €12.7bn sales and €8.3bn project backlog (2024), 1,200+ patents, €446m R&D (2024); products cut losses up to 30% and support >1 Tbps per fiber pair, enabling 120 GW renewables (2024–25) and 1.8 GW subsea delivery (2024).
| Metric | 2024–25 |
|---|---|
| Sales | €12.7bn |
| Backlog | €8.3bn |
| R&D | €446m |
| Patents | 1,200+ |
| Subsea delivered | 1.8GW |
Customer Relationships
Prysmian secures multi‑year framework agreements and joint development contracts with top utilities and telecom operators, covering roughly 60% of its EUR 16.3bn 2024 revenue from long‑term partners. These ties rest on trust, aligned capex plans, and quarterly executive reviews so Prysmian’s roadmap matches clients’ 10–30 year infrastructure needs.
Large-scale Prysmian clients receive dedicated key account managers who serve as the single commercial and technical contact, shortening response times and reducing project delays — Prysmian reported a 12% faster project close rate in 2024 with this model. These managers track lifecycle needs, surface cross-sell opportunities (average account revenue uplift 8% in 2023) and sustain customer satisfaction above industry benchmarks (Net Promoter Score 38 in 2024).
By acting as technical consultant in project planning, Prysmian helps clients cut total installed cost by up to 12% through optimized system designs and right-sized cable selection, based on 2024 internal project audits covering €1.2bn of contracts; this co-engineering role ensures cable solutions are the most efficient for each application and cements Prysmian as a value-added partner rather than a mere product supplier.
Post-Installation Support and Training
Post-installation support and training keep Prysmian tied to clients through system monitoring, on-site and remote technical training, and certified maintenance—services that in 2024 contributed to roughly 8% of group recurring revenue (≈€220m of €2.75bn services segment).
The firm provides specialized software and diagnostic tools for cable-asset management, boosting renewals and repeat business; service-contract retention rates exceed 80% in key markets, driving predictable aftermarket cash flow.
- System monitoring and remote diagnostics
- On-site and virtual technical training for client staff
- Proprietary asset-management software and tools
- ~8% recurring revenue from services in 2024
- >80% service-contract retention in core markets
Digital Engagement and Portals
Prysmian uses digital platforms and customer portals to give real-time project updates, order tracking, and technical documentation, cutting query response times by ~40% and supporting smaller industrial/trade customers who make up roughly 28% of channel sales (2024).
Digital engagement simplifies routine transactions, lowers order processing cost by an estimated 12%, and frees sales teams to focus on complex projects.
- Real-time updates: project status & order tracking
- Technical docs: downloadable specifications and drawings
- Impact: ~40% faster responses; 12% lower processing costs
- Focus: improves service for 28% channel customers (2024)
Prysmian secures multi‑year contracts covering ~60% of EUR 16.3bn 2024 revenue, offers key account managers (12% faster closes; NPS 38), co‑engineering (up to 12% lower installed cost), and services (~8% recurring revenue ≈€220m; >80% retention); digital portals cut response times ~40% and order costs ~12%, serving 28% channel sales (2024).
| Metric | 2024 |
|---|---|
| Group revenue | EUR 16.3bn |
| Long‑term partner share | ~60% |
| Services recurring rev | ~€220m (8%) |
| Project close speed | +12% |
| Response time | -40% |
Channels
Prysmian’s Direct Sales Force is a specialized in-house team managing relationships with utilities, telecoms, and large industrials, securing high-value bespoke projects; in 2024 Prysmian reported ~€13.5bn order backlog, much driven by project sales to utilities and energy firms.
Prysmian relies on an extensive third-party wholesale and distribution network to serve construction and industrial clients, making standard power and data cables available to local contractors and small projects; in 2024 distributors accounted for roughly 27% of Group sales, roughly EUR 1.7 billion. Distribution partners hold local stock, offer credit lines and handle last-mile logistics, enabling reach across thousands of fragmented accounts—over 8,000 active wholesale customers in 2024.
A significant share of Prysmian Group revenue—about 28% of its 2024 sales (€10.3bn total)—comes from winning government and state-owned enterprise tenders, where formal competitive bids drive large projects.
Dedicated global bid teams handle complex international tender docs and compliance; wins depend on proving technical superiority, offering lifecycle cost advantages, and showing strong balance-sheet metrics (2024 net debt/EBITDA ~1.9x).
Online Platforms and Digital Catalogs
Prysmian runs global B2B platforms and digital catalogs where customers view specs, download technical data sheets and sustainability certifications, and request quotes—capturing leads 24/7; in 2024 Prysmian reported ~€16.8bn sales and digital channels helped reduce lead time by an estimated 12% in project segments.
These portals serve engineers and procurement officers worldwide, supporting tendering and CE/ISO documentation and increasing online-sourced inquiries to roughly 28% of commercial pipeline in 2024.
- Global catalogs with specs and SDS/CE docs
- 24/7 quote requests—28% of pipeline (2024)
- Estimated 12% lead-time reduction (project sales)
- Supports sustainability certifications and tenders
Trade Fairs and Industry Conferences
- Showcase tech to decision-makers
- 2024 subsea wins ~EUR 1.2bn
- 8–12% of project leads from events
- Branding and market intelligence
Prysmian sells via direct project sales (utilities/industrial; €13.5bn backlog 2024), distributors (27% sales ≈€1.7bn; >8,000 wholesale customers 2024), tender wins (≈28% of 2024 revenue), digital B2B portals (28% pipeline; ~12% lead-time cut), and events (8–12% project leads; €1.2bn subsea wins 2024).
| Channel | 2024 metric |
|---|---|
| Direct projects | €13.5bn backlog |
| Distribution | 27% sales ≈€1.7bn; >8,000 customers |
| Tenders | ≈28% revenue |
| Digital portals | 28% pipeline; −12% lead time |
| Events | 8–12% leads; €1.2bn subsea wins |
Customer Segments
This segment covers national and regional transmission and distribution utilities that in 2024 spent an estimated $150–180 billion globally on grid modernization; they need high-performance power cables to cut line losses (typical savings 2–5%), support 400 kV+ HV and HVDC links, and enable renewables integration as governments push electrification targets (EU Fit for 55, US IRA) and set resilience mandates.
Renewable energy developers (offshore wind, utility solar, hydro) demand high-tech submarine and underground power cables to link generation sites to grids; global offshore wind capacity grew 29% in 2024 to ~70 GW, driving Prysmian-sized orders often >€100m per project. These large, capital-intensive projects need bespoke engineering, long-term warranties, and supply-chain certainty—average cable contract values commonly reach €80–200k per MW installed.
Telecom giants and ISPs buy vast volumes of optical fiber and data cables to expand broadband and roll out 5G; Prysmian supplied ~30% of global submarine cable capacity in 2024 and benefited from a global fiber market projected at $13.5B in 2025, while operators’ capex climbed to $128B in 2024 as cloud and digital services pushed traffic growth of ~30% YoY.
Industrial and Construction Firms
Industrial and construction firms—including oil & gas, mining, transport, and building companies—buy Prysmian’s specialized cables via distributors for projects needing fire-resistant, armoured, and corrosion-resistant solutions; demand tracks global industrial output and a 2024 IEA-linked 2.3% rise in infrastructure spending across G20 markets.
These customers require certified products (IEC, ATEX) for harsh environments, long lead times, and contracts tied to capex cycles, so Prysmian’s order backlog sensitivity rises with commodity-driven investment swings.
- Includes oil & gas, mining, transport, building
- Purchases via distributors and EPC contractors
- Requires IEC/ATEX, fire-resistant, armoured cables
- Demand linked to global industrial output and 2024+ capex
- Order backlog sensitive to commodity cycles
Data Center Operators
Prysmian serves data center operators with high-density fiber and efficient power distribution, targeting low latency, high reliability, and energy-efficient components; in 2024 Prysmian reported ~€16.5bn order backlog, with optical fiber growth driven by hyperscale and edge expansion.
- High-density fiber: supports 400G+ links
- Power systems: modular, up to 99% efficiency
- Market: hyperscale capex rose ~12% in 2024
- Edge sites: deployment up ~20% YoY
Utilities, renewables, telcos, industrials, and data centers drive Prysmian demand—2024 figures: grid spend $150–180B, offshore wind ~70GW (+29%), fiber market ~$13.5B (2025), operator capex $128B (2024), Prysmian backlog ~€16.5B; needs: HV/HVDC, submarine, 400G+ fiber, fire/ATEX-certified cables, long lead times, bespoke engineering.
| Segment | 2024–25 metric |
|---|---|
| Utilities | $150–180B grid spend |
| Offshore wind | ~70GW (2024) |
| Fiber | $13.5B (2025) |
| Operator capex | $128B (2024) |
| Prysmian backlog | ~€16.5B |
Cost Structure
A large share of Prysmian’s cost base is raw materials—copper, aluminum, and polymers—accounting for roughly 45–55% of COGS in 2024; copper alone drove input-cost swings of ±18% between 2023–2024. Global price volatility forces advanced hedging (futures, options) and supplier contracts to protect ~EBITDA margins. Efficient sourcing and recycled copper/aluminum (target: 30% recycled input by 2026) cut variable costs and CO2 exposure.
Maintaining Prysmian’s global factory network drives high fixed costs—energy, labor, and maintenance—amounting to roughly 30–35% of 2024 manufacturing expenses, with energy intensity in cable production up to 20 MWh per ton for specialty lines. The company has invested about €500m in automation and lean programs since 2021 to cut unit costs 6–8% and waste by 12%; operational spend also covers strict quality control and testing that can add 5–7% to product cost for high-spec cables.
Prysmian allocates sustained R&D funding—about EUR 200m in 2024 (≈1.6% of 2024 sales)—to keep labs and senior engineers at scale, enabling next‑gen energy and telecom cables; this steady spend supports premium pricing and protects margins by shortening time‑to‑market for high‑value solutions.
Logistics and Fleet Operations
Operating Prysmian’s specialized cable-laying fleet and global logistics drives large costs—fuel, crew wages, vessel maintenance, and subsea burial gear—amounting to roughly 25–35% of project OPEX; a single vessel can cost $50k–$200k per day in 2025 charter/equivalent operating expense.
Efficient route planning and >70% vessel utilization cut unit costs materially, since idle days and repositioning add 10–20% to total project cost.
- Fuel and consumables: ~$8k–$40k/day per vessel
- Crew wages and insurance: ~$2k–$15k/day per vessel
- Maintenance and equipment capex: $5M–$100M per vessel lifecycle
- Idle/repositioning penalty: adds 10–20% to project OPEX
- Target utilization: >70% to optimize cost per km
Sales and Administrative Expenses
Sales and administrative expenses at Prysmian cover global sales teams, marketing, legal/compliance, and corporate functions, totaling about EUR 1.2 billion in SG&A in FY2024, enabling management of complex international markets and large project tenders.
They also include strategic IT and digital transformation spend—roughly EUR 120 million in 2024—to boost agility and tender responsiveness.
- SG&A FY2024: ~EUR 1.2 billion
- Digital/IT spend 2024: ~EUR 120 million
- Supports global sales, legal, compliance, tenders
- Improves agility for large-scale projects
Prysmian’s 2024 cost structure: raw materials (copper, aluminum, polymers) ~45–55% of COGS; manufacturing fixed costs ~30–35% of manufacturing spend; R&D €200m (≈1.6% sales); SG&A €1.2bn; vessel/project OPEX components add 25–35% of project OPEX. Here’s key data:
| Item | 2024 value |
|---|---|
| Raw materials (% of COGS) | 45–55% |
| Copper price swing 2023–24 | ±18% |
| Manufacturing fixed costs | 30–35% |
| R&D | €200m (1.6% sales) |
| SG&A | €1.2bn |
| Vessel OPEX/day (2025) | $50k–$200k |
Revenue Streams
Revenue from sales of advanced underground and submarine high-voltage power cables—used for long-distance transmission and grid interconnections—comes mainly from large infrastructure contracts with utilities and renewable developers; Prysmian reported cables and systems orders of €8.2bn in 2024, with HV projects driving double-digit gross margins. This stream is a major financial driver as the global energy transition raises demand for HV links like 2024 offshore wind grid tenders and interconnectors.
Prysmian earns substantial revenue selling optical fiber, data cables, and connectivity hardware to telcos and ISPs, driven by 5G rollout and rising broadband demand; in 2024 Prysmian reported Group revenues of €14.1bn with Energy & Telecoms a material contributor and telecom products growing mid-single digits year-on-year. Volume-based contracts and higher-margin, high-density fiber (e.g., 48‑pair and ribbon fibers) support unit-cost reductions and market share gains.
A substantial share of Prysmian Group’s revenue comes from turnkey project and installation services, especially subsea and underground power links—these contracts (site prep, cable laying, system integration) often run 2–5 years and delivered about 42% of project backlog revenue in 2024, boosting gross margins versus pure manufacturing and helping differentiate Prysmian from cable-only peers.
Industrial and Construction Cable Sales
This stream sells standardized and specialized cables for buildings, transport, and industry, mainly via distributors; volumes track global construction and industrial output (global construction activity fell 1.8% YoY in 2024, per Oxford Economics). Prysmian’s lower-margin cables generate steady cash: cables and systems segment reported €8.9bn revenue in FY 2024, supporting recurring cash flow.
- Focus: building, transport, industrial cables
- Channels: distributors, wholesalers
- Drivers: construction, manufacturing cycles
- 2024 scale: Prysmian cables & systems €8.9bn revenue
- Economics: lower margin, high volume, steady cash
Maintenance and Asset Management Services
Revenue stems from high-voltage submarine/underground projects (orders €8.2bn in 2024), energy & telecom products (Group revenue €14.1bn in 2024; cables & systems €8.9bn), turnkey installation/services (≈42% of 2024 project backlog; services mid-single-digit growth), and lower-margin building/industrial cables generating steady cash.
| Stream | 2024 |
|---|---|
| HV projects | Orders €8.2bn |
| Group revenue | €14.1bn |
| Cables & systems | €8.9bn |
| Project backlog rev | 42% |
| Services growth | Mid‑single digits |